Construction Chronology - page 3 |
The office was looking good in it's final color of blue. The floor was painted with a water proof base. Five more trees came out of the yard. The gnome was supervising. Scraping and painting continued on the inside. We began moving items from the old ministry center into this building. |
Final color of paint on the cabinets in the kitchen. Primer was applied in the hallway. Ethernet wires were pulled. More debris was pulled out of the side yard. |
Work continued in the new sanctuary and in the kitchen. The dumpster returned to remove all the debris from both inside and out, and to handle upcoming emergency roof repairs. Don showed up with a bobcat to really tackle the outside work |
|