Construction Chronology - page 10 |
The concrete was poured. The inside doors were constructed. Clasrooms were painted. and the poles were wrapped. |
Both the interior and exteror were painted. |
The altar was carpeted and new railings were installed. The exterior was painted, and a garden was planted. Railings were installed along the ramp. |